Guizhou JDS New Material Co., Ltd.
Technical documents
HPAEco-Friendly Adhesives

Application 02

Adhesive evaluation for LVL manufacturing

Technical support for long-grain veneer bonding, lay-up consistency and pressing evaluation.

Discuss this application
Panel dimensions being checked during production

Production challenge

Treat the bond line as a system.

LVL production demands repeatable bond lines across multiple veneer layers. The trial plan must account for lay-up, veneer preparation, pressing and the final performance requirement.

01

Veneer preparation

02

Lay-up configuration

03

Open and closed assembly time

04

Press schedule and conditioning

Expected project outputs

A clearer next decision.

01

Application-specific trial design

02

Controlled evaluation criteria

03

Support during line adjustment

04

A documented technical review

Technical consultation

Planning a lvl trial?

Share the board construction, current process and acceptance method. HPA will help organize the technical brief.

Start an inquiry
WA